power distribution cabinet

Smart Waste Management Solution Launches in Southeast Asia

Mar 19, 2025

On March 19, 2025, our company announced the successful delivery and commissioning of a custom waste rake control cabinet project for a waste treatment plant in the Philippines. Tailored to the Philippines’ complex environment of high temperatures, humidity, and dust, this solution features advanced protective and intelligent control capabilities, boosting local waste processing efficiency by 30% and marking a significant breakthrough in our Southeast Asian market expansion.

I. Project Background: Philippine Waste Management Challenges Drive Customization Needs

As a populous Southeast Asian nation, the Philippines generates over 18,000 tons of waste daily. However, outdated equipment with low automation and high failure rates struggles to withstand the country’s humid, rainy, and corrosive conditions. A local waste treatment plant approached us for a custom waste rake control cabinet, demanding reliable operation under extreme conditions to optimize efficiency and reduce maintenance costs.

II. Customized Solution: Technology Meets Local Scenarios

  1. Environmentally Resilient Design
    • The cabinet uses 304 stainless steel material with an IP65 protection rating, resisting salt spray and dust erosion.
    • Internal circuits are enhanced with moisture-proof treatment and smart temperature-controlled fans, ensuring continuous heat dissipation at 40°C to prevent component aging.
  2. Intelligent Control Upgrade
    • Integrates a PLC control system, supporting dual remote/local operation modes. Staff can monitor equipment status and adjust grabbing frequencies in real time via a mobile app.
    • Features dual overload and leakage protection, with soft-start technology reducing power consumption by 15% annually.
  3. Local Adaptation
    • Circuit layouts customized for the client’s existing 15kW waste rake model, compatible with the Philippines’ 220V voltage standard.
    • Bilingual (English + Filipino) operation interface minimizes training costs for local workers.

III. Project Outcomes: Client Recognition and Industry Benchmark

  • Efficiency Boost: Post-installation, waste grabbing efficiency increased from 8 tons/hour to 10.5 tons/hour, reducing manual intervention through automated workflows.
  • Maintenance Cost Reduction: Modular design cuts repair time by 50%, saving approximately $20,000 annually in maintenance fees.
  • Client Testimonial“This control cabinet perfectly solved our frequent equipment downtime during the rainy season—its stability and intelligence far exceed expectations!” — Mr. Evan, Project Lead, Philippine Client.

Need Help? Chat with us

leave a message
For any request of information or technical support, fill in the form. All fields marked with an asterisk* are required.
Submit
Looking for FAQs?
Contact us #
+86-18960903717

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

home

products

whatsApp

Contacts Us